The Mountain Eagle
WHITESBURG WEATHER

IN THE COLD HARD RAIN








— The east end of Main Street was closed January 12 as workers with the City of Whitesburg and Hale Contracting withstood driving rains and falling temperatures to repair a water leak.

— The east end of Main Street was closed January 12 as workers with the City of Whitesburg and Hale Contracting withstood driving rains and falling temperatures to repair a water leak.

Leave a Reply